Summary:
- Cargas Energy Work Orders are designed to track a discrete set of service tasks that get billed together. Every task added to a Work Order lives in one document, and the Work Order screen has to load all of those tasks at once when it opens.
- There is no hard limit on how many tasks can be added to a single Work Order. When a Work Order accumulates many tasks the amount of data the browser has to render becomes increasingly large which makes opening the work order take longer and longer over time.
- Work Orders are great for tracking and billing a discrete set of tasks over a short lifespan, and Service Jobs are a way to track Projects over a long lifespan and can still be combined into one invoice.
Environment:
- Cargas Energy versions 2021.12 and newer
Work Orders vs Service Jobs:
Work orders aren't designed to be used for long ongoing projects and are meant to keep track of smaller groups of tasks, typically completed in a single day or week. Service Jobs are a great way to keep track of longer projects while still allowing all of the work to be billed at once.
A Service Job lets you link multiple Work Orders together under one umbrella, so you can track the whole project without forcing every task into a single overloaded document. You can even combine the invoices from those linked Work Orders into one bill when you're ready. Here's how you can set it up.
- Create a Service Job for the overall project at Service > Jobs > New.
- For each visit, phase, or logical batch of work, create a new Work Order.
- Assign the Work Order to the Job: How do I Assign a Work Order to a Service Job in New Service?
- Complete and Bill each Work Order as its tasks are finished, instead of leaving it open indefinitely.
- When you're ready to invoice, you can bill each Work Order individually or combine the Work Orders on the Job into a single invoice. How do I combine service invoices on one job?
Warning Signs You Should Switch to a Service Job
- The Work Order has been open for more than a few days and is still collecting new tasks.
- You've lost track of how many tasks are on the Work Order.
- Different people/visits are adding tasks to the same Work Order over time.
- You're keeping a Work Order open just so everything gets billed together at the end.
If any of these apply, it's best to start a new work order and assign them both to a Service Job before the current work order becomes too large.
Additional Info:
Service Job Overview: Video: What are Service Jobs and how do they work?